The wind farm consists of two groups of wind turbines, built in different years: 7 wind turbines built in 2001 and 8 built in 2002.This makes a total of 15 triblade wind turbines (unitary capacity: 0.6 MW), for a total installed capacity of 9 MW. The energy produced by each wind turbine is collected at Medium Voltage, by means of an underground cable network. An underground duct connects the MV/LV cabins, and then goes on to the Electrical Station in Monteferrante, where the energy is transformed and enters the public grid at 150 kV voltage.