Portocannone (CB)

The production made in the Colle di Lauro concession area comes uniquely from the Portocannone field, which was discovered in July 1963 with a well and was subsequently expanded by drilling a further 28 wells. The production coming from the Portocannone wells is collected by means of a network of flow lines which channel the gas to a treatment and compression facility located in Piane di Larino. Production in this site started in June 1966 with two wells; 25 further wells were added in the following years. The most recently drilled well started production in December 1992. 

Main features

Campobasso (CB), Molise
TYPE OF FACILITY

on-shore

DETAILS

Operating since: 1966

Average expected production: about 36000 m3/day

Grant situation: currently in production

Number of wells: 29 (20 are currently in production)

Operator: Edison  (62,42%), ENI (12,5%), GPI (25,08%)

Treatment and gas storage: Central of Larino