- ~2,000 km total length, shorter than the Azeri chain, comparable to the Norwegian one
- 800 km main offshore section, less than NordStream and TurkStream
- 2,200 m average depth of the main section, in line with TurkStream and Medgaz
- 3,000 m the max water depth, only for 10 km, as pipelines in operation in the Gulf of Mexico
- 18 months to lay the offshore section, in line with TurkStream