Operating since 1999, the wind farm consists of 9 0.35MW, single blade wind turbines, adding up to a total installed capacity of 3.15 MW.
The electricity produced is collected at Medium Voltage through an underground cable network. An underground duct transmits to the main ENEL grid at the Medium Voltage service drop (20kV).