The facility consists of two groups of wind turbines, built in different years. 5 wind turbines were built in 2001, and 3 in 2003, making a total of 8 triblade wind turbines, with 0.6MW unitary power adding up to a total installed capacity of 4.8MW. The electricity produced is collected in MV by means of an underground cable network. An underground duct transmit to the main ENEL line at the medium voltage service drop.