Cervino hydroelectric power plant (AO)

The plant has an installed capacity of 2.753 KW.

Main features

Valtournenche (AO)
OPERATING SINCE
2011
INSTALLED CAPACITY
2.753 KW
AVERAGE PRODUCTION
8,5 GWh/a
DETAILS

Hydraulic rod: Torrente Marmore

Concession jump: 113,4 m

Maximum capacity: 2,8 m3/s