Cellino storage field

<img loading="lazy" src="/sites/default/files/stoccaggio_3.jpg" alt="Cellino" title="Cellino" />

Created in 1984, the Cellino storage field was enhanced in 2010; this resulted in an increase in capacity, while the original conditions of the field were fully respected. The Cellino field has a storage capacity of roughly 120 million cubic metres of natural gas. The field consists of 5 active wells, through which the gas is stored in the field or distributed from the field, at an average depth of 850 metres.